2026 BMW M5 Base at BMW Of North Haven
https://research.bmwofnorthhaven.com/cars/Used/2026/BMW/M5/Base/173658522026 BMW M5 Base
Selling Price: $106,516
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 8,863
- VIN : WBS83FK06TCV05661
- Stock # : 24156BSD1
- Engine :
- Transmission : 8-Speed Automatic Sport
- Ext. Color : Black
- Int. Color : Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : AWD
City MPG *
0
Hwy MPG *
0
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Navigation System
- Connected Package Pro Limited Term
- Driving Assistance Professional Package
- Executive Package
- 18 Speakers
- AM/FM radio: SiriusXM with 360L
- Bowers & Wilkins Surround Sound
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM with 360L and 1 Year Trial Subscription
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear dual zone A/C
- Rear window defroster
- Head restraints memory
- Heads-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel memory
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Low tire pressure warning
- M Compound Brakes with Black Calipers
- Occupant sensing airbag
- Overhead airbag
- Power adjustable front head restraints
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Lane Change Assistant
- Speed control
- Traffic Jam Assistant
- Auto-dimming door mirrors
- BMW Iconic Glow Kidney Grille
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Turn signal indicator mirrors
- Apple CarPlay and Android Auto Compatibility
- Auto tilt-away steering wheel
- Auto-dimming Rear-View mirror
- BMW Assist ECall
- BMW Curved Display with HUD
- BMW TeleServices
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Driving Assistant Professional
- Fine Wood Dark Oak High Gloss Trim
- Front reading lights
- Garage door transmitter
- Heated steering wheel
- Illuminated entry
- Interior Camera
- Leather steering wheel
- M Multi-Function Seats
- Outside temperature display
- Parking Assistant Plus
- Parking View with 3D View (Surround View)
- Partial Automated Driving
- Passenger vanity mirror
- Personal ESIM 5G
- Rear reading lights
- Rear seat center armrest
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Wireless Device Charging
- Front and Rear Heated Seats
- Front Bucket Seats
- Front Center Armrest
- Front Ventilated Seats
- Heated Front Seats
- Heated front seats
- Merino Leather Upholstery
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 20" x 10.5" Front and 21" x 11" Rear M Dual-Spoke
- Power Rear Sunshade and Rear Side Window Shades
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- ONE OWNER
- CLEAN CARFAX...NO ACCIDENTS!
- RECENT BMW OF NORTH HAVEN TRADE IN
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
ONE OWNER, CLEAN CARFAX...NO ACCIDENTS!, RECENT BMW OF NORTH HAVEN TRADE IN, BMW Iconic Glow Kidney Grille, Bowers & Wilkins Surround Sound, Connected Package Pro Limited Term, Driving Assistance Professional Package, Driving Assistant Professional, Executive Package, Front and Rear Heated Seats, Front Ventilated Seats, Head restraints memory, Heated Front Seats, Interior Camera, Lane Change Assistant, M Compound Brakes with Black Calipers, Merino Leather Upholstery, Parking Assistant Plus, Parking View with 3D View (Surround View), Partial Automated Driving, Power Rear Sunshade and Rear Side Window Shades, Traffic Jam Assistant, Wheels: 20" x 10.5" Front and 21" x 11" Rear M Dual-Spoke.
BMW of North Haven is a part of the Mauro Motors Auto Group, a 30 year automotive company that has thrived off of its reputation to deliver exceptional experiences and vehicles to our community. As one of the best BMW centers in the region, our customers can always expect a great selection of vehicles, an attention-to-detail mindset in every department, a team that is friendly to work with and is focused on meeting their customers needs while generating long-term relationships. Interested in this vehicle? Our client advisors are standing by and excited to schedule your next visit. Call us at (203) 239-7272 to set up an appointment!