2024 BMW M3 Base at BMW Of North Haven
https://research.bmwofnorthhaven.com/cars/Used/2024/BMW/M3/Base/162109532024 BMW M3 Base
Selling Price: $73,497
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 26,099
- VIN : WBS53AY02RFR63315
- Stock # : 22837BS
- Engine :
- Transmission : 6-Speed Manual
- Ext. Color : Black
- Int. Color : Fiona Red/Black
- Vehicle Type : Sedan
- Body Style : 4D Sedan
- Drivetrain : RWD
City MPG *
16
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Navigation
- Navigation System
- Connected Package Pro
- Executive Package
- 16 Speakers
- AM/FM radio: SiriusXM
- harman/kardon Surround Sound System
- harman/kardon® Speakers
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM w/360L & 1 Year Platinum Plan Subscription
- Air Conditioning
- Automatic temperature control
- Front dual zone A/C
- Rear air conditioning
- Rear window defroster
- Lumbar Support
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Power Tailgate
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Auto High-beam Headlights
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Auto-dimming door mirrors
- Bumpers: body-color
- Extended Shadowline Trim
- Heated door mirrors
- Icon Adaptive LED Headlights w/Laserlight
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Apple CarPlay & Android Auto Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW Curved Display w/HUD
- BMW TeleServices
- Carbon Fiber Trim
- Compass
- ConnectedDrive Services
- Driver door bin
- Driver vanity mirror
- Front reading lights
- Garage door transmitter
- Heated Steering Wheel
- Illuminated entry
- Leather Shift Knob
- Outside temperature display
- Passenger vanity mirror
- Rear reading lights
- SensaTec Dashboard
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Wireless Device Charging
- Extended Merino Leather Upholstery
- Front Bucket Seats
- Front Center Armrest
- Heated Front Seats
- Heated front seats
- M Sport Seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Passenger door bin
- Alloy wheels
- Wheels: 18"x9.5" Fr. & 19"x10.5"Rr. M Orbit Gray
- Wheels: 19"x9.5" Fr.&20"x10.5"Rr. M Bi-color (1T8)
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- REMAINDER OF FACTORY WARRANTY
- RECENT BMW OF NORTH HAVEN TRADE IN
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
The 2024 BMW M3 impresses with its power and versatility, offering sports car-level handling and acceleration while maintaining a comfortable ride at high speeds according to U.S News. This 2024 BMW M3 comes in a Black Sapphire exterior and a Fiona Red/Black interior.
REMAINDER OF FACTORY WARRANTY, RECENT BMW OF NORTH HAVEN TRADE IN,
This 2024 BMW M3 comes with many features such as: BMW Curved Display w/HUD, Executive Package, Heated Steering Wheel, Power Tailgate, SensaTec Dashboard and much more!
BMW of North Haven is a part of the Mauro Motor's Auto Group, a 30 year automotive company that has thrived off of its reputation to deliver exceptional experiences and vehicles to our community. As one of the best BMW centers in the region, our customers can always expect a great selection of vehicles, an attention-to-detail mindset in every department, a team that is friendly to work with and is focused on meeting their customers' needs while generating long-term relationships. Interested in this vehicle? Our client advisors are standing by and excited to schedule your next visit. Call us at (203) 239-7272 to set up an appointment!