2023 BMW M4 Competition at BMW Of North Haven
https://research.bmwofnorthhaven.com/cars/Used/2023/BMW/M4/Competition/171679952023 BMW M4 Competition
Selling Price: $75,152
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 27,191
- VIN : WBS43AZ0XPCL73727
- Stock # : 23929BSD1
- Engine :
- Transmission : 8-Speed Automatic Steptronic
- Ext. Color : Blue
- Int. Color : Tartufo
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : AWD
City MPG *
16
Hwy MPG *
22
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
- Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
- M Sport Seats
- Extended Merino Leather Upholstery
- Front Ventilated Seats
- Radio: AM/FM Audio System
- Driving Assistance Professional Package
- Parking Assistance Package
- Executive Package
- BMW iPerformance Design Elements Deletion
- M Compound Brakes w/Red Calipers
- M Shadowline Lights
- Moonroof
- Carbon Fiber Trim
- Wireless Charging
- Remote Engine Start
- Heated Steering Wheel
- Power Tailgate
- Power Front Seats
- Lumbar Support
- Heated Front Seats
- Extended Traffic Jam Assistant
- Active Driving Assistant Pro
- Parking Assistant Plus
- Head-Up Display
- SiriusXM Satellite Radio
- harman/kardon Surround Sound System
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Enhanced USB/Bluetooth Plus Smartphone Integration
- Live Cockpit Pro w/Navi
- WiFi Hotspot
- 4-Wheel Disc Brakes
- Emergency communication system: BMW Assist eCall
- harman/kardon® Speakers
- Auto High-beam Headlights
- Exterior Parking Camera Rear
- AM/FM radio: SiriusXM
- Compass
- 16 Speakers
- Speed-Sensitive Wipers
- Auto-dimming Rear-View mirror
- Front beverage holders
- Variably intermittent wipers
- Turn signal indicator mirrors
- Trip computer
- Traction control
- Tilt steering wheel
- Telescoping steering wheel
- Steering wheel mounted audio controls
- Sport steering wheel
- Split folding rear seat
- Speed-sensing steering
- Speed control
- Security system
- Remote keyless entry
- Rear window defroster
- Rear seat center armrest
- Rear reading lights
- Rear anti-roll bar
- Rear air conditioning
- Rain sensing wipers
- Radio data system
- Power windows
- Power steering
- Power passenger seat
- Power driver seat
- Power door mirrors
- Passenger vanity mirror
- Passenger door bin
- Panic alarm
- Overhead console
- Overhead airbag
- Outside temperature display
- Occupant sensing airbag
- Memory seat
- Low tire pressure warning
- Knee airbag
- Illuminated entry
- Heated front seats
- Heated door mirrors
- Garage door transmitter
- Fully automatic headlights
- Front reading lights
- Front dual zone A/C
- Front anti-roll bar
- Four wheel independent suspension
- Dual front side impact airbags
- Dual front impact airbags
- Driver vanity mirror
- Driver door bin
- Delay-off headlights
- Bumpers: body-color
- Brake assist
- Automatic temperature control
- Auto-dimming door mirrors
- Alloy wheels
- Adaptive suspension
- ABS brakes
- Tachometer
- Spoiler
- Navigation System
- Leather Shift Knob
- Front Center Armrest
- Front Bucket Seats
- Electronic Stability Control
- Air Conditioning
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
ONE OWNER, CLEAN CARFAX...NO ACCIDENTS!, RECENT BMW OF NORTH HAVEN TRADE IN, Active Driving Assistant Pro, Driving Assistance Professional Package, Electronic Stability Control, Executive Package, Extended Merino Leather Upholstery, Extended Traffic Jam Assistant, Front Ventilated Seats, Garage door transmitter, harman/kardon Surround Sound System, Head-Up Display, Heated Front Seats, Heated Steering Wheel, Lumbar Support, M Shadowline Lights, M Sport Seats, Parking Assistance Package, Parking Assistant Plus, Power Front Seats, Power Tailgate, Remote Engine Start, Security system, Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M).
BMW of North Haven is a part of the Mauro Motors Auto Group, a 30 year automotive company that has thrived off of its reputation to deliver exceptional experiences and vehicles to our community. As one of the best BMW centers in the region, our customers can always expect a great selection of vehicles, an attention-to-detail mindset in every department, a team that is friendly to work with and is focused on meeting their customers needs while generating long-term relationships. Interested in this vehicle? Our client advisors are standing by and excited to schedule your next visit. Call us at (203) 239-7272 to set up an appointment!