2020 BMW M4 CS at BMW Of North Haven
https://research.bmwofnorthhaven.com/cars/Used/2020/BMW/M4/CS/173993182020 BMW M4 CS
Selling Price: $57,997
Photo Gallery
Vehicle Basics
Additional Incentives
- Condition : Used
- Mileage : 48,376
- VIN : WBS3S7C08LFH18677
- Stock # : 24183BSD1
- Engine :
- Transmission : 7-Speed Automatic
- Ext. Color : Red
- Int. Color : Anthracite
- Vehicle Type : Coupe
- Body Style : 2D Coupe
- Drivetrain : RWD
City MPG *
17
Hwy MPG *
23
*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.
Vehicle Features
- Navigation System
- Executive Package
- 9 Speakers
- AM/FM radio: SiriusXM
- CD player
- DVD-Audio
- Hands-Free Bluetooth & USB Audio Connection
- Radio data system
- Radio: AM/FM Audio System
- SiriusXM Satellite Radio
- Air Conditioning
- Automatic temperature control
- Rear window defroster
- Head-Up Display
- Memory seat
- Power driver seat
- Power steering
- Power windows
- Remote keyless entry
- Steering wheel mounted audio controls
- Adaptive suspension
- Four wheel independent suspension
- Speed-sensing steering
- Traction control
- 4-Wheel Disc Brakes
- ABS brakes
- Dual front impact airbags
- Dual front side impact airbags
- Emergency communication system: BMW Assist eCall
- Front anti-roll bar
- Knee airbag
- Low tire pressure warning
- Occupant sensing airbag
- Overhead airbag
- Rear anti-roll bar
- Brake assist
- Electronic Stability Control
- Exterior Parking Camera Rear
- Automatic High Beams
- Delay-off headlights
- Fully automatic headlights
- Panic alarm
- Security system
- Speed control
- Adaptive Full LED Lights
- Auto-dimming door mirrors
- Bumpers: body-color
- Heated door mirrors
- Power door mirrors
- Spoiler
- Turn signal indicator mirrors
- Advanced Real-Time Traffic Information
- Apple CarPlay Compatibility
- Auto-dimming Rear-View mirror
- BMW Assist eCall
- BMW TeleServices
- ConnectedDrive Services
- Driver vanity mirror
- DVD Area Coding (North America)
- Front reading lights
- Garage door transmitter
- Illuminated entry
- Instrument Cluster w/Extended Contents
- Leather Shift Knob
- Outside temperature display
- Passenger vanity mirror
- Rear reading lights
- Rear seat center armrest
- Remote Services
- Speed Limit Info
- Sport steering wheel
- Tachometer
- Telescoping steering wheel
- Tilt steering wheel
- Trip computer
- Alcantara/Leather Upholstery
- Front Bucket Seats
- Heated Front Seats
- Heated front seats
- Power Front Seats
- Power passenger seat
- Split folding rear seat
- Alloy wheels
- Wheels: 19" x 9" Fr & 20" x 10" Rr M V-Spoke
- Power Rear Sunshade
- Rain sensing wipers
- Speed-Sensitive Wipers
- Variably intermittent wipers
- CLEAN CARFAX...NO ACCIDENTS!
- M SPORT PKG
- RECENT BMW OF NORTH HAVEN TRADE IN
- CARBON FIBER ROOF
Disclaimer & Legal Info
Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.
The 2020 BMW M4 CS brings a sharper, more focused edge to BMWs high-performance M4 lineup. With its turbocharged power, rear-wheel drive, and performance-oriented tuning, it delivers an exhilarating driving experience. The M4 CS combines aggressive styling with everyday usability in a distinctive performance coupe. This highly limited M4 CS comes in a Melbourne Red Metallic exterior along with a Anthracite interior.
CLEAN CARFAX...NO ACCIDENTS!, M SPORT PKG, RECENT BMW OF NORTH HAVEN TRADE IN, CARBON FIBER ROOF.
Designed for both sport and comfort, this 2020 M4 CS comes equipped with: Adaptive Full LED Lights, Adaptive suspension, Alcantara/Leather Upholstery, Apple CarPlay Compatibility, Automatic High Beams, Bumpers: body-color, Electronic Stability Control, Executive Package, Exterior Parking Camera Rear, Four wheel independent suspension, Front Bucket Seats, Hands-Free Bluetooth & USB Audio Connection, Head-Up Display, Illuminated entry, Memory seat, Navigation System, Power driver seat, Power Rear Sunshade, Remote keyless entry, Security system, Speed Limit Info, Speed-sensing steering, Wheels: 19" x 9" Fr & 20" x 10" Rr M V-Spoke, and so much more!
BMW of North Haven is a part of the Mauro Motor's Auto Group, a 30 year automotive company that has thrived off of its reputation to deliver exceptional experiences and vehicles to our community. As one of the best BMW centers in the region, our customers can always expect a great selection of vehicles, an attention-to-detail mindset in every department, a team that is friendly to work with and is focused on meeting their customers' needs while generating long-term relationships. Interested in this vehicle? Our client advisors are standing by and excited to schedule your next visit. Call us at (203) 239-7272 to set up an appointment!