BMW Of North Haven
610 Washington Ave North Haven, CT 06473

2026 BMW M5 Base at BMW Of North Haven

2026 BMW M5 Base

Selling Price: $134,215

Photo Gallery

Vehicle Basics

  • Vehicle Make : BMW
  • Vehicle Model : M5
  • Condition : New
  • Mileage : 18
  • VIN : WBS83FK03TCX64611
  • Stock # : B19140
  • Engine :
  • Transmission : 8-Speed Automatic Sport
  • Ext. Color : Gray
  • Int. Color : Black
  • Vehicle Type : Sedan
  • Body Style : 4D Sedan
  • Drivetrain : AWD
City MPG * 0 Hwy MPG * 0

*Actual MPG rating will vary with options, driving conditions, habits and vehicle condition.

Dark Graphite Metallic 2026 BMW M5 AWD 8-Speed Automatic Sport 4.4L V8 Turbocharged DOHC 32V LEV3-SULEV30

Browse Other Vehicles at BMW Of North Haven

Dealership Info

BMW logo

BMW Of North Haven

BMW Of North Haven

Vehicle Features

  • Wheels: 20" x 10.5" Front and 21" x 11" Rear M Dual-Spoke
  • BMW Iconic Glow Kidney Grille
  • M Compound Brakes with Red Calipers
  • Power Rear Sunshade and Rear Side Window Shades
  • Carbon Fiber Silver Thread High Gloss Trim
  • Front Ventilated Seats
  • Power Front Seats
  • Heated Front Seats
  • Front and Rear Heated Seats
  • M Multi-Function Seats
  • Interior Camera
  • Driving Assistant Professional
  • Parking Assistant Plus
  • SiriusXM with 360L and 1 Year Trial Subscription
  • BMW Assist ECall
  • BMW TeleServices
  • ConnectedDrive Services
  • Connected Package Pro Limited Term
  • Bowers & Wilkins Surround Sound
  • Wireless Device Charging
  • Personal ESIM 5G
  • BMW Curved Display with HUD
  • M Carbon Exterior Package
  • Carbon Fiber Reinforced Polymer Roof
  • Mirror Caps
  • Spoiler
  • Training Service Fee
  • Merino Leather Upholstery
  • Radio: AM/FM Audio System
  • Apple CarPlay and Android Auto Compatibility
  • Driving Assistance Professional Package
  • Carbon Package
  • Traffic Jam Assistant
  • Lane Change Assistant
  • Partial Automated Driving
  • Executive Package
  • Parking View with 3D View (Surround View)
  • 4-Wheel Disc Brakes
  • Emergency communication system: BMW Assist eCall
  • AM/FM radio: SiriusXM with 360L
  • Auto High-beam Headlights
  • Exterior Parking Camera Rear
  • Speed-Sensitive Wipers
  • Heads-Up Display
  • 18 Speakers
  • Auto-dimming Rear-View mirror
  • Variably intermittent wipers
  • Turn signal indicator mirrors
  • Trip computer
  • Traction control
  • Tilt steering wheel
  • Telescoping steering wheel
  • Steering wheel mounted audio controls
  • Steering wheel memory
  • Sport steering wheel
  • Split folding rear seat
  • Speed-sensing steering
  • Speed control
  • Security system
  • Remote keyless entry
  • Rear window defroster
  • Rear seat center armrest
  • Rear reading lights
  • Rear dual zone A/C
  • Rear anti-roll bar
  • Rear air conditioning
  • Rain sensing wipers
  • Radio data system
  • Power windows
  • Power steering
  • Power passenger seat
  • Power driver seat
  • Power door mirrors
  • Power adjustable front head restraints
  • Passenger vanity mirror
  • Passenger door bin
  • Panic alarm
  • Overhead airbag
  • Outside temperature display
  • Occupant sensing airbag
  • Memory seat
  • Low tire pressure warning
  • Leather steering wheel
  • Illuminated entry
  • Heated steering wheel
  • Heated front seats
  • Heated door mirrors
  • Head restraints memory
  • Garage door transmitter
  • Fully automatic headlights
  • Front reading lights
  • Front dual zone A/C
  • Front anti-roll bar
  • Four wheel independent suspension
  • Dual front side impact airbags
  • Dual front impact airbags
  • Driver vanity mirror
  • Driver door bin
  • Delay-off headlights
  • Bumpers: body-color
  • Brake assist
  • Automatic temperature control
  • Auto-dimming door mirrors
  • Auto tilt-away steering wheel
  • Alloy wheels
  • Adaptive suspension
  • ABS brakes
  • Tachometer
  • Navigation System
  • Front Center Armrest
  • Front Bucket Seats
  • Electronic Stability Control
  • Air Conditioning

Disclaimer & Legal Info

Prices do not include additional fees and costs of closing, including government fees and taxes, any finance charges, any dealer documentation fees, any emissions testing fees or other fees. All prices, specifications and availability subject to change without notice. Contact dealer for most current information. Prices are valid thru the close of business, today only.